PRA
Pre-Refurbishment Audit.
Pre-Refurbishment audits that identify what to retain, retrofit and reuse before work starts, giving your team a documented, defensible basis for every retain-versus-replace decision.

What is a Pre-Refurbishment Audit?
Book an auditA pre-refurbishment audit (often shortened to pre-refurb audit) assesses a building before refurbishment starts, to work out space by space what should stay in place, what can be reused elsewhere on-site, and what genuinely needs replacing. Unlike a demolition audit, the starting assumption is not that everything comes out; it is a retain-first stocktake.
Where demolition is still an option at pre-application, a pre-redevelopment audit comes first, to test whether the building should be kept at all.
- Every asset is photographed, measured and assessed for condition
- The design team gets evidence for each decision, rather than a judgement call
Why you need a Pre-Refurbishment Audit?
Under BREEAM Refurbishment and Fit-out V7, a pre-refurbishment audit can help in directly achieving Wst01 credits for completing the audit, as well as providing information that can feed into Resource Efficiency and Diversion credits.
- A BREEAM-compliant report, helping to achieve accreditation
- Assess whether materials can be retained or reused, with accompanying embodied carbon data to highlight the impact of each material and decision
- Highlight opportunities for reuse: where materials are to be removed, they can recoup value, prevent waste and save embodied carbon through Material Index's follow-on services

A Material Index PRA includes.
Site Survey.

Full site survey
Digital Audit & Workshops.

Digital Audit on the MI Platform, with full project team access

Circular Economy Workshop / Optioneering
Compliance Reporting.

PDF PRA report

PDF & CSV Asset Registers
Audit Enquiry.
Tell us about your project and we will come back with a scope and a fee proposal.
It helps to include:
- The site address and approximate floor area (GIA)
- The audit you need, or the planning, BREEAM or GLA requirement it is for
- Your programme: when you need the report, and when strip-out or demolition starts
- Any drawings, asbestos surveys or previous audits of the building
We have completed over 250 audits across the UK, to BREEAM, GLA and LEED requirements. We aim to respond the same day, or within 24 hours, and can be on site within 5 days.
Material Index Audits.
We audit existing buildings ahead of refurbishment to work out, space by space, what should stay in place, what can be reused elsewhere on-site, and what genuinely needs replacing. Every asset is photographed, measured and assessed for condition, so your design team and planning consultants have a proper evidence base rather than a judgement call.
A pre-refurbishment audit gives you evidence in a format ready for planning submission and BREEAM assessment (opens in new tab). It also flags anything that can't stay in place but still has value: Material Index can connect these items with our Trade Partner network through the Material Index Marketplace, recouping value that might otherwise have been lost.

Case Studies.

Greencoat & Gordon HouseDerwent London
With Derwent London from Stage 2 through to Stage 4. Online material management lets tenants and the owner find portfolio reuse.
Read the case study
Oliver’s YardDerwent London, Collins Construction
A pre-refurbishment audit for this office building in Islington was driven by the client’s policy to divert material from landfill. A Material Index audit facilitated off-site reuse of kitchenettes, toilets, hand dryers, and specialist lighting in collaboration with Collins.
Read the case studyHow does a Material Index PRA meet compliance?
Compliance
- BREEAM Wst01: Construction Waste Reduction credits
- GLA Circular Economy Statement Guidance
- London Plan Policy SI 7 (Circular Economy)
- Westminster Retrofit First Policy
- Data provided in European Waste Codes, BREEAM waste codes and Uniclass component codes
Ideal for
- Office and commercial refurbishment projects
- Cat A and Cat B fit-out strip-outs
- Retail, hotel and leisure refits
- Landlords and occupiers running rolling refurbishment programmes
Areas Material Index covers.
We deliver audits across London and the UK. Get in touch to start your project.
Audit to Action.
Every audit is a live inventory. Use it to catalogue, manage exchange and track your materials. Material Index offers follow-on services to broker your materials to registered Trade Partners before strip-out or deconstruction begins.

Audit
Qualified auditors catalogue every component on site using our audit app.

Collaborate
The project team reviews the inventory together on the MI platform and decides what to retain, reuse or sell.

Exchange
We broker materials to registered Trade Partners through the marketplace, with full tracking and reporting.
FAQ.
What is the difference between a pre-refurbishment and a pre-demolition audit?
A pre-refurbishment audit is carried out before a strip-out where the structure is being retained, focusing on fit-out, finishes, services and FF&E. A pre-demolition audit is carried out before a building is fully or partly demolished and covers the structure as well.
How quickly can you complete one?
We can usually get to site at short notice and return the report within about five working days, so it fits around your strip-out and refurbishment programme.
What do you need from us to carry out the audit?
Access to the building and, where available, floor plans, an asset or FF&E list and your strip-out or refurbishment programme. We work from whatever information exists and capture the rest on site.