All Case Studies
Greencoat & Gordon House.
With Derwent London from Stage 2 through to Stage 4. Online material management lets tenants and the owner find portfolio reuse.
Working closely with Derwent London, Material Index have been involved from Stage 2 through to Stage 4. The online material management has allowed tenants and the building owner to explore portfolio reuse opportunities.
- Client


More Case Studies.
View allExplore Case Studies by Type
Audit Enquiry.
Tell us about your project and we will come back with a scope and a fee proposal.
It helps to include:
- The site address and approximate floor area (GIA)
- The audit you need, or the planning, BREEAM or GLA requirement it is for
- Your programme: when you need the report, and when strip-out or demolition starts
- Any drawings, asbestos surveys or previous audits of the building
We have completed over 250 audits across the UK, to BREEAM, GLA and LEED requirements. We aim to respond the same day, or within 24 hours, and can be on site within 5 days.











