All Case Studies
Oliver’s Yard.
A pre-refurbishment audit for this office building in Islington was driven by the client’s policy to divert material from landfill. A Material Index audit facilitated off-site reuse of kitchenettes, toilets, hand dryers, and specialist lighting in collaboration with Collins.

More Case Studies.
View allExplore Case Studies by Type
Audit Enquiry.
Tell us about your project and we will come back with a scope and a fee proposal.
It helps to include:
- The site address and approximate floor area (GIA)
- The audit you need, or the planning, BREEAM or GLA requirement it is for
- Your programme: when you need the report, and when strip-out or demolition starts
- Any drawings, asbestos surveys or previous audits of the building
We have completed over 250 audits across the UK, to BREEAM, GLA and LEED requirements. We aim to respond the same day, or within 24 hours, and can be on site within 5 days.











