Skip to content

MRA

Material Reclamation Audit.

A Material Reclamation Audit is a bespoke MI service: a faster, cost-effective survey focused on the components most likely to be reused and recycled, with a plan to divert them from landfill.

Material Reclamation Audit taking place on a live site

What is an MRA?

Book an audit

A Material Reclamation Audit is a bespoke Material Index service, built to be a more cost-effective survey that concentrates on the components most likely to be reused or recycled. It maps the materials scheduled for removal, assesses their condition, volume and reuse potential, and sets out an actionable plan to divert them from landfill.

  • The Asset Register is built on site using the MI platform
  • A typical office floor can be done in a few hours, with results available straight away
  • That speed suits refurbishment and strip-out programmes with tight timeframes, and sites with excess stock to clear

What you get.

A fast route from survey to materials leaving site, with the numbers to show for it.

  • Digital Asset Register, component by component, with environmental metrics captured on the platform
  • Material exchange support, matching items with Trade Partners, charities and reuse schemes through the Material Index Marketplace
  • Circularity report: what was diverted from landfill, the embodied carbon avoided, and the Goods Transfer Notes for every item that left site
Digital asset register created on site through the Material Index platform

A Material Index MRA includes.


Site Survey.

  • Full site survey

    Full site survey

Digital Audit & Workshops.

  • Digital Audit on the MI Platform, with full project team access

    Digital Audit on the MI Platform, with full project team access

  • Circular Economy Workshop / Optioneering

    Circular Economy Workshop / Optioneering

Compliance Reporting.

  • PDF MRA report

    PDF MRA report

  • PDF & CSV Asset Registers

    PDF & CSV Asset Registers

Audit Enquiry.

Tell us about your project and we will come back with a scope and a fee proposal.

It helps to include:

  • The site address and approximate floor area (GIA)
  • The audit you need, or the planning, BREEAM or GLA requirement it is for
  • Your programme: when you need the report, and when strip-out or demolition starts
  • Any drawings, asbestos surveys or previous audits of the building

We have completed over 250 audits across the UK, to BREEAM, GLA and LEED requirements. We aim to respond the same day, or within 24 hours, and can be on site within 5 days.

How does a Material Index MRA meet compliance?

Ideal for

  • Refurbishment and retrofit projects
  • Projects with tight timeframes and deadlines
  • Sites with excess material and stock
  • Bespoke commercial sites and retail units

Areas Material Index covers.

We deliver audits across London and the UK. Get in touch to start your project.

London
WestminsterCity of LondonCamdenHackneyTower Hamlets
UK
BristolEssexYorkshireNorth WestWest MidlandsSouth WestSouth EastEast of EnglandScotlandWales
International
SpainUSAAustraliaWe can connect you to Material Index auditors in these regions.

Audit to Action.

Every audit is a live inventory. Use it to catalogue, manage exchange and track your materials. Material Index offers follow-on services to broker your materials to registered Trade Partners before strip-out or deconstruction begins.

A surveyor holding a rugged tablet in an office being stripped out

Audit

Qualified auditors catalogue every component on site using our audit app.

The Material Index platform on screen as a colleague presents it to a project team

Collaborate

The project team reviews the inventory together on the MI platform and decides what to retain, reuse or sell.

Reclaimed bricks stacked on a pallet ready for collection

Exchange

We broker materials to registered Trade Partners through the marketplace, with full tracking and reporting.

FAQ.

How is an MRA different from a pre-demolition audit?

An MRA is faster and more targeted. It focuses on the components most likely to be reused or recycled, rather than cataloguing the whole fabric for BREEAM or GLA compliance, so it suits tight refurbishment programmes and value recovery.

How quickly can you do one?

We can get to site within five working days, and a typical office floor is captured in a few hours with results available straight away.

What happens to the materials afterwards?

Reusable items are listed to our marketplace and brokered to 300+ registered Trade Partners, or we can arrange donations through our charity partner network, with each material leaving site with a Goods Transfer Note. The rest is routed down the waste hierarchy to recycling.