Skip to content

PRDA

Pre-Redevelopment Audit.

A pre-redevelopment audit (PRDA) is carried out at pre-application to assess whether existing buildings, structures and materials can be retained, adapted, reclaimed or taken into the new scheme: the evidence base for a Circular Economy Statement.

Interior of an existing building assessed for retention

What is a PRDA?

Book an audit

A pre-redevelopment audit (PRDA) is carried out at pre-application by an independent third party, to test whether the existing building, structure and materials can be retained, adapted or taken into the new scheme. It gives the design team independently verified evidence of what reuse is possible before anything is committed to demolition.

Once the decision is made, the next audit follows from it: a pre-demolition audit if the building is coming down, or a pre-refurbishment audit if it is being kept and refitted.

  • Describes the existing buildings and their state of repair, following the GLA's guidance
  • Age, key materials, photographs of typical interiors and facades, and site plans
  • So retention can be judged on evidence, not assumption

PRDAs for planning approvals.

Pre-Redevelopment audits are increasingly part of planning approvals in London. For schemes referable to the Mayor, the GLA's Circular Economy Statement guidance (opens in new tab) expects one:

  • At outline and full planning application
  • Encouraged at pre-application, while it can still shape the design
  • From a third party, independently verified or peer-reviewed
  • As the evidence base for the Circular Economy Statement
Sanitaryware recovered from a strip-out, stacked on pallets for reuse

A Material Index PRDA includes.


Site Survey.

  • Full site survey

    Full site survey

Digital Audit & Workshops.

  • Digital Audit on the MI Platform, with full project team access

    Digital Audit on the MI Platform, with full project team access

    Included when a PDA is procured at the same time.

  • Circular Economy Workshop / Optioneering

    Circular Economy Workshop / Optioneering

Compliance Reporting.

  • PDF PRDA report

    PDF PRDA report

  • PDF & CSV Asset Registers

    PDF & CSV Asset Registers

Audit Enquiry.

Tell us about your project and we will come back with a scope and a fee proposal.

It helps to include:

  • The site address and approximate floor area (GIA)
  • The audit you need, or the planning, BREEAM or GLA requirement it is for
  • Your programme: when you need the report, and when strip-out or demolition starts
  • Any drawings, asbestos surveys or previous audits of the building

We have completed over 250 audits across the UK, to BREEAM, GLA and LEED requirements. We aim to respond the same day, or within 24 hours, and can be on site within 5 days.

Designing out waste.

A PRDA supports applicants in demonstrating how proposals will design out waste, reduce it, and treat waste as a resource across lifecycle modules. The audit evaluates the feasibility of retaining the whole or parts of the existing building while meeting development objectives, in the context of broader social, economic and environmental considerations.

Material Index reporting on retention and reuse options

PRDAs in Westminster and the City of London.

Westminster's Retrofit First policy (City Plan Policy 43) asks for a PRDA where more than half of a building's floor area would be demolished, sequentially tested for structural soundness, requirements of use, whole-life carbon and public benefit.

The City of London's Planning for Sustainability SPD (2025) expects one in the Circular Economy Statement for every major scheme, including:

  • A site visit and review of existing surveys and materials
  • Retention options assessed for carbon and circular economy
  • A reuse catalogue of at least five key items
  • Measurable targets for retained, reused and recycled materials
Material Index auditors surveying plant on a site before redevelopment

How does a Material Index PRDA meet compliance?

Compliance

  • GLA Circular Economy Statement Guidance
  • Westminster City Plan Policy 43: Retrofit First
  • City of London Planning for Sustainability SPD (2025)
  • London Plan circular economy and whole life-cycle carbon policies

Ideal for

  • Sites with existing buildings proposed for redevelopment
  • Planning applications requiring Circular Economy Statements
  • Westminster, Camden, and City of London submissions
  • Projects targeting retrofit-first approaches

Areas Material Index covers.

We deliver audits across London and the UK. Get in touch to start your project.

London
WestminsterCity of LondonCamdenHackneyTower Hamlets
UK
BristolEssexYorkshireNorth WestWest MidlandsSouth WestSouth EastEast of EnglandScotlandWales
International
SpainUSAAustraliaWe can connect you to Material Index auditors in these regions.

Audit to Action.

Every audit is a live inventory. Use it to catalogue, manage exchange and track your materials. Material Index offers follow-on services to broker your materials to registered Trade Partners before strip-out or deconstruction begins.

A surveyor holding a rugged tablet in an office being stripped out

Audit

Qualified auditors catalogue every component on site using our audit app.

The Material Index platform on screen as a colleague presents it to a project team

Collaborate

The project team reviews the inventory together on the MI platform and decides what to retain, reuse or sell.

Reclaimed bricks stacked on a pallet ready for collection

Exchange

We broker materials to registered Trade Partners through the marketplace, with full tracking and reporting.

FAQ.

How is a PRDA different from a pre-demolition audit?

A PRDA is earlier and broader: at pre-application it tests whether the building can be kept at all. A pre-demolition audit catalogues the materials once demolition or partial demolition is the route.

Who should carry it out?

An independent third party. The GLA expects the assessment to be independently verified or peer-reviewed, and we are that third party.

When do I need one?

At pre-application, while it can still shape the design, and to support the Circular Economy Statement at outline and full application.

What do you need from us?

Access to the building and any existing surveys, drawings and the proposed scheme. We work from what exists and capture the rest on site.