Skip to content
All Case Studies

GSK Brentford.

A Material Reclamation Audit and tracking dashboard for John F Hunt. We brokered the reclaimed material that came out of it.

For John F Hunt, we carried out a Material Reclamation Audit, developed a Material Tracking Dashboard, and facilitated brokering for Hadley Property Group's GSK Brentford project at 980 Great West Road.

Start a Project
GSK Brentford, Pre-Demolition Audit, Material Reclamation Audit, Material Exchange for John F Hunt

Audit Enquiry.

Tell us about your project and we will come back with a scope and a fee proposal.

It helps to include:

  • The site address and approximate floor area (GIA)
  • The audit you need, or the planning, BREEAM or GLA requirement it is for
  • Your programme: when you need the report, and when strip-out or demolition starts
  • Any drawings, asbestos surveys or previous audits of the building

We have completed over 250 audits across the UK, to BREEAM, GLA and LEED requirements. We aim to respond the same day, or within 24 hours, and can be on site within 5 days.