A Material Reclamation Audit and brokering at Peninsular House: 9,326 assets reused and 300 tonnes kept out of landfill.
- 9,326
- assets reused
- 300 t
- diverted from landfill
- £20,863
- in material sales
- £14,305
- in avoided waste disposal costs
The redevelopment of the Peninsular House office building in the City of London saw Material Index carry out a Material Reclamation Audit across all 11,401 m2, followed by brokering of the assets it identified: raised access floor tiles, air conditioning, hand dryers, lighting, sanitaryware and bike racks. We worked closely with the strip-out contractor on site to coordinate collections through our trade partner network, reusing 9,326 assets and saving 612 kg CO2e.

More Case Studies.
View allExplore Case Studies by Type
Audit Enquiry.
Tell us about your project and we will come back with a scope and a fee proposal.
It helps to include:
- The site address and approximate floor area (GIA)
- The audit you need, or the planning, BREEAM or GLA requirement it is for
- Your programme: when you need the report, and when strip-out or demolition starts
- Any drawings, asbestos surveys or previous audits of the building
We have completed over 250 audits across the UK, to BREEAM, GLA and LEED requirements. We aim to respond the same day, or within 24 hours, and can be on site within 5 days.