Skip to content
All Case Studies

Lund Point.

Case Study:AuditsHousing

A Pre-Deconstruction Audit of a 22-storey 1970s housing block on the Carpenters Estate. The scheme keeps most of its structure.

For Populo Living, Material Index carried out a Pre-Deconstruction Audit of Lund Quarter on the Carpenters Estate in Stratford, East London: the 1970s Lund Point tower of ground plus 21 storeys, warehouses on Rowse Close and terraced houses on Biggerstaff Road, around 17,600 m² in all. The audit gave every material a pathway in line with the waste hierarchy, supporting a redevelopment that retains and reuses the majority of the Lund Point structure.

Start a Project
Lund Point, Pre-Demolition Audit for Populo Living

Audit Enquiry.

Tell us about your project and we will come back with a scope and a fee proposal.

It helps to include:

  • The site address and approximate floor area (GIA)
  • The audit you need, or the planning, BREEAM or GLA requirement it is for
  • Your programme: when you need the report, and when strip-out or demolition starts
  • Any drawings, asbestos surveys or previous audits of the building

We have completed over 250 audits across the UK, to BREEAM, GLA and LEED requirements. We aim to respond the same day, or within 24 hours, and can be on site within 5 days.