Hills Building, Birmingham.
A Pre-Demolition Audit of a three-storey campus building for the University of Birmingham, supporting its BREEAM targets.
Material Index carried out a Pre-Demolition Audit of the Hills Building for the University of Birmingham at RIBA Stage 1, surveying the red-brick building on the west side of campus in March 2025. Originally built for the Department of Chemistry and more recently home to the School of Psychology, the building was catalogued component by component, with reuse, recycling and waste pathways set out in line with BREEAM Wst 01 and the GLA's circular economy guidance.
- Client
- University of Birmingham
- Service
- Pre-Demolition Audit

More Case Studies.
View allExplore Case Studies by Type
Audit Enquiry.
Tell us about your project and we will come back with a scope and a fee proposal.
It helps to include:
- The site address and approximate floor area (GIA)
- The audit you need, or the planning, BREEAM or GLA requirement it is for
- Your programme: when you need the report, and when strip-out or demolition starts
- Any drawings, asbestos surveys or previous audits of the building
We have completed over 250 audits across the UK, to BREEAM, GLA and LEED requirements. We aim to respond the same day, or within 24 hours, and can be on site within 5 days.









