Dukes Hotel.
A Material Reclamation Audit (MRA) was conducted by Material Index at DUKES Hotel located in St James’ Mayfair, prior to its refurbishment. Instructed by the DML Group, MI made a saving of approximately 182 tonnes CO2e at this iconic 90 key hotel.