Old Street Quarter.
A Pre-Deconstruction Audit of the Moorfields Eye Hospital site at Old Street, ahead of a residential-led scheme that keeps buildings where it can.
For Related Argent, on its joint venture with Derwent London, Material Index carried out a Pre-Deconstruction Audit of Old Street Quarter: the Islington city block occupied by Moorfields Eye Hospital and the UCL Institute of Ophthalmology, around 42,600 m² across buildings dating from 1898 to 2006. The audit gave every material a pathway in line with the waste hierarchy, supporting a residential-led redevelopment that retains buildings and facades where it can, including the original 1898 hospital.
- Clients


- Service
- Pre-Demolition Audit

More Case Studies.
View allExplore Case Studies by Type
Audit Enquiry.
Tell us about your project and we will come back with a scope and a fee proposal.
It helps to include:
- The site address and approximate floor area (GIA)
- The audit you need, or the planning, BREEAM or GLA requirement it is for
- Your programme: when you need the report, and when strip-out or demolition starts
- Any drawings, asbestos surveys or previous audits of the building
We have completed over 250 audits across the UK, to BREEAM, GLA and LEED requirements. We aim to respond the same day, or within 24 hours, and can be on site within 5 days.










