Projects
Oliver's Yard Collins Construction
The driving force for the pre-refurbishment audit for this office building in Islington, was the client’s policy to avoid landfill as much as possible.
Old Ford London Legacy Development Corporation
The London Legacy Development Corporation engaged Material Index to provide environmental reporting, capture residual value, and minimize waste on their ‘Old Ford’ Wastewater Recycling Centre site in East London’s Queen Elizabeth Olympic Park.
Dovetail Deconstruct UK
Material Index was appointed by Deconstruct UK to conduct a brokering survey and facilitate the reuse of glass partitions from a London office demolition site.
1 Appold Street British Land
1 Appold Street, an office building from the late 1980s in the Broadgate Estate, was undergoing a strip-out as part of an extensive commercial redevelopment.
Material Index conducted a thorough pre-demolition audit, creating a detailed asset register.